Location: Yellowknife, NT
Duration: 18 months
Cost: $1.4 Million
Description:
Major renovation and upgrade of electrical systems in the existing high school. Even though the school was occupied at the time of the construction, we were able to complete the required work in four consecutive phases with no disruption to the students.
|